Wall fence installation steps
1. Preparation: Please prepare a work table
2. Install a Creep: Place the bar lawn guard supplier by length and place the PTE Creep at the side of the bar through-hole.
3. Install a fixed vertical rod: the same size fence fence bar rails placed on the work of the table, a unified side of the waterproof pad. Insert a fixed vertical rod (with screw hole) into the crossbar from the opposite side of the waterproof gasket.

4. Tighten the screws: Use a large flat-blade screwdriver clockwise to tighten the garden fence supplier's screws to make the fixed vertical bar and horizontal bar form a guardrail frame.
5. Install the vertical rod: the bottom of the through-hole for the vertical rod along the same direction into the bar.
6. Install the upper and lower card: a large card for the host card, a small card for the next card. First installed on the card. Insert the side of the clip U-shaped opening into the vertical bar.
7. Use a special clamp to push the clamp to reach the slot position, automatically bounce. Then install the lower card according to law. When the installation error can also use a flat-blade screwdriver into the vertical bar to flush the clip.
8. Assembly completed: Press UNG completed, check each rod is fixed in place to complete the assembly work.

Pre:To understanding the advantage and application of chain link fence
Next:You Should Pay Attention To Those Things When You Buy Stadium Fence
How can South American distributors find suitable fence suppliers? (Professional Procurement Guide)
How to Ensure Fencing Products for the South American Market Meet Local Quality Standards
How to Choose the Right Metal Fence Products for the South American Market?
Chain Link Fence – Flexible, Cost-Effective Fencing Solutions for Global Projects